I was away on Friday and Monday's lesson as I was in Melbourne, but lucky enough Isabella my partner was there! I was so happy walking into class to find so much progress done by Isabella! She has made the Sling and everything to hold it! Here is the progress:
Wednesday, October 30, 2013
Monday, October 21, 2013
The Opposite Side
Today in DF we made the opposite side for the trebuchet! Personally, I think this was much easier than the first one because we basically just copied the other side! We got it done very quickly and are ahead of most people in our class. We didn't have any troubles making this, but the only problem is it doesn't look exactly the same, however, that isn't going to be a trouble when it starts to use it because its only that it doesn't look the same. It is very effective with its strength.
Sunday, October 13, 2013
Making the Side!
Today in DT Isabella and I decided it was time to make one of the sides for the trebuchet! It was a very successful lesson. We had no problems and our design is very pretty looking, however, we didn't want that to be the main case for making this, because the task is to make the trebuchet work! So we did heaps of triangles to support the wood and nailed them in. Most other groups used PVA glue to sick the wood and triangles together before nailing, however, Isabella and I used a hot glue gun before nailing as a test to see if it provides better support! I think the hardest part will be getting the other side of this trebuchet to match the length and width to this side as we didn't really measure exactly we just made sure we went by the requirements on 550cm in length! I will take a progress picture tomorrow to show you just how far we have gone and how proud I am of us girls!
Wednesday, October 9, 2013
Making the Base
Today in Design and Technology my partner and I, Isabella, made the base! this was a very effective lesson for us as we both worked very quickly and so so good together! to make the base for the trebuchet, we had to get a board and 2 wood sticks. first you had to draw to lines parallel to each other about 9/10 mm away from the vertical edge. After this, we had to put around 5-6 nails half way through on each side. We then got the 2 sticks and put glue on them to help them stick. Then we put the nails all the way through, to put the board and sticks together. The only problem i had today was i bent one of the nails and it came out the side of the stick. It was fixed quickly when Mr Ward came and helped me to get it out. I am very happy with the end of todays result.
Subscribe to:
Posts (Atom)